Episode 1: Manufacturing and Production Engineering Costs vs. Independent Research & Development Costs

For companies that incur manufacturing, production line, engineering or product development costs, determining the true nature of the cost can be difficult. The Federal Acquisition Regulation (“FAR”) points us to FAR 31.205-25 — Manufacturing and Production Engineering Cost, to help companies determine if the cost incurred should be considered a manufacturing and production engineering cost. However, the issue companies have is where one draws the line if the costs should actually be considered independent research & development (“IR&D”). Determining if the costs falls under FAR 31.205-25 or meets the definition of FAR 31.205-18 and is considered IR&D doesn’t just impact. Read More.

Topics: , , , , ,

Department of Defense Continues to Tinker with the Allowability of IR&D

Beginning in 2011, the Department of Defense (“DoD”) began making changes to the supplemental cost principle on Independent Research and Development (IR&D) found at the Defense Federal Acquisition Supplement (DFARS) 231.205-18. These changes have not affected the definition of IR&D found at Federal Acquisition Regulation 31.205-18. Instead, they have addressed what certain contractors must do in order for their IR&D costs to be allowable on government contracts. The latest proposed change in the allowability requirements set forth in the DFARS was published in the Federal Register on February 16, 2016 . The proposed change reformats the existing DFARS 231.205-18(c)(iii)(C) and adds a new requirement that reads: For IR&D projects. Read More.

Topics: , , , , , ,